Case Histories

If you're looking for custom air handling ideas, check out ClimateCraft case studies. Each example profiles a customer with a unique application customized to their specific needs. At ClimateCraft, we'll work directly with you and your representatives to build the solution best-suited to your particular requirements.

Have you had an exceptional experience with ClimateCraft? Let us know!

Healthcare

  • Halifax Health Medical Center (PDF)
    Installation cost savings and weekend replacement schedule make ACCESS
    site-assembled units a winning strategy for Florida medical center.
  • Vanderbilt University Medical Center (PDF)
    ClimateCraft replaces research facility air handling unit using ACCESS
    knock down equipment within 52 hours from start to finish.
  • MD Anderson Cancer Center (PDF)
    ClimateCraft uses ACCESS™ units to replace old air handling units, without
    disrupting patients, hospital operations, or other mechanical equipment.

Specialized Manufacturing Environments

  • IM Flash Technologies (PDF)
    ClimateCraft provides air handling units for state-of-the-art specialized manufacturing facilities that require stringent control requirements to maintain consistent HVAC operating environments to assure product quality.

Education

  • University Residence Hall (PDF)
    ClimateCraft ACCESS™ unit is designed, built, delivered and installed in five days while students are on Spring Break.
  • Community College of Denver (PDF)
    ClimateCraft installs ACCESS™ units in a confined room space during
    Christmas shutdown to minimize disruption to campus.

Government

  • Idaho State Supreme Court Building (PDF)
    ClimateCraft provides key contractor support and a large ACCESS™ replacement air handling unit for the historic Idaho State Supreme Court Building.